Production Performance of Oil & Natural Gas Sector for July, 2016
OREANDA-NEWS. Crude oil production during July 2016 was 3077.40 TMT which is 0.39% and 1.81% lower than target
- Crude oil production during July 2016 was 3077.40 TMT which is 0.39% and 1.81% lower than target and production achieved in July 2015 respectively. Cumulative crude oil production during April-July, 2016 was 12078.34 TMT which is 0.69% and 2.95% lower than target and production during corresponding period of last year respectively. Unit-wise and state-wise crude oil production is given at Annexure-I.
Table-1: Crude Oil Production (in TMT)
Oil Company |
Target |
July (Month) |
April-July (Cumulative) |
||||||
2016-17 (Apr-Mar) |
2016-17 |
2015-16 |
% over last year |
2016-17 |
2015-16 |
% over last year |
|||
Target |
Prod. |
Prod. |
Target |
Prod. |
Prod. |
||||
ONGC |
22766.00 |
1899.32 |
1867.77 |
1880.87 |
99.30 |
7442.90 |
7359.84 |
7455.31 |
98.72 |
OIL |
3480.00 |
270.76 |
272.69 |
275.14 |
99.11 |
1068.94 |
1070.87 |
1112.12 |
96.29 |
PSC Fields |
10839.32 |
919.52 |
936.94 |
978.14 |
95.79 |
3649.88 |
3647.63 |
3877.75 |
94.07 |
Total |
37085.32 |
3089.60 |
3077.40 |
3134.15 |
98.19 |
12161.71 |
12078.34 |
12445.18 |
97.05 |
*: Provisional
Unit-wise production details with reasons for shortfall are given below:
1.1 Crude oil production by ONGC during July, 2016 was 1867.77 TMT which is 1.66% lower than the monthly target and 0.70% less when compared with July, 2015. Cumulative crude oil production during April-July, 2016 was 7359.84 TMT which is 1.12% lower than target for the period and 1.28% lower than the production during corresponding period of last year. Reasons for shortfall in production in some fields are as under:
- Natural decline from matured and marginal cluster fields
- Maintenance of Mumbai-Uran Trunkline due to safety reasons
- Assam: Less than envisaged production from new wells, producing wells becoming sick, power shutdown & less gas injection pressure.
- Rajahmundry: Closure of 24 wells due to repair / replacement of Kadali-Tatipaka & Endamuru-Oduru GAIL pipelines. Decline in flowing pressure of self-flowing wells in Malleshwaram field. Increase in water cut in Gopavaram field.
- Cauvery: Less than envisaged production from Kamlapuram.
1.2 Crude oil production by OIL during July, 2016 was 272.69 TMT which is 0.71% higher than monthly target and 0.89% less than production in July 2015. Cumulative crude oil production during April-July, 2016 was 1070.87 TMT which is 0.18% higher than target for the period but 3.71% lower than the production during corresponding period of last year. Reasons for shortfall in production are as under:
- Less than planned contribution from old well
- Rise in water cut in wells of Greater Hapjan, Bhogpara & Greater Chandmari fields
- Loss in production due to bandhs and blockades by various Organisations
1.3 Crude oil production by Pvt. /JVs during July 2016 was 936.94 TMT which is 1.90% higher than the monthly target but 4.21% less when compared with July, 2015. Cumulative crude oil production during April-July, 2016 was 3647.63 TMT which is 0.06% lower than target for the period and 5.93% lower than the production during corresponding period of last year. Reasons for shortfall in production are as under:
- Natural Decline in Ravva, CB-OS/2 and Panna-Mukta
- Closure of one well in MA and one well in D1D3 field
Natural Gas
- Natural gas production during July 2016 was 2704.65 MMSCM which is 2.76% lower than the target for the month but 3.27% higher than the production in July 2015. Cumulative natural gas production during April-July, 2016 was 10449.30 MMSCM which is 2.85% lower than target for the period and 3.80% lower than the production during corresponding period of last year. Unit-wise and state-wise natural gas production is given at Annexure-II.
Table-2: Natural Gas Production (MMSCM)
Oil Company |
Target |
July (Month) |
April-July (Cumulative) |
||||||
2016-17 (Apr-Mar) |
2016-17 |
2015-16 |
% over last year |
2016-17 |
2015-16 |
% over last year |
|||
Target |
Prod. |
Prod. |
Target |
Prod. |
Prod. |
||||
ONGC |
22743.43 |
1855.79 |
1823.73 |
1684.81 |
108.25 |
7086.84 |
6996.14 |
7166.68 |
97.62 |
OIL |
2950.03 |
260.61 |
256.12 |
232.59 |
110.12 |
1008.77 |
986.83 |
874.23 |
112.88 |
PSC Fields |
8425.44 |
665.06 |
624.80 |
701.69 |
89.04 |
2660.12 |
2466.33 |
2821.52 |
87.41 |
Total |
34118.90 |
2781.46 |
2704.65 |
2619.08 |
103.27 |
10755.72 |
10449.30 |
10862.42 |
96.20 |
*: Provisional
2.1 Natural gas production by ONGC during July, 2016 was 1823.73 MMSCM which is 1.73% lower than the monthly target but 8.25% higher when compared with July 2015. Cumulative natural gas production during April-July, 2016 was 6996.14 MMSCM which is 1.28% lower than the cumulative target and 2.38% lower than the production during the corresponding period of last year. Reasons for shortfall in production are as under:
- Offshore: Natural decline from Bassein field and restricted withdrawal of gas by GAIL in EOA
- Ankleshwar: Closure of wells in Gandhar / North Gandhar fields due to pipeline repairs by M/s. GAIL
- Karaikal : Less off-take by GAIL consumers
2.2 Natural gas production by OIL during July, 2016 was 256.12 MMSCM which is 1.73% lower than the monthly target but 10.12% higher than July 2015. Cumulative natural gas production during April-July, 2016 was 986.83 MMSCM which is 2.17% lower than the cumulative target but 12.88% higher than the production during the corresponding period of last year. Reasons for shortfall in production are as under:
- NTPS: due to shutdown of GT#2 and GT#5 and load evacuation problem.
- Loss in production due to water loading problem in a few wells.
- Disruption in gas supply due to blockade and restricted browser movement in Deohal area.
- Unscheduled shutdown by IOCL (AOD) for maintenance.
2.3 Natural gas production by Pvt. /JVs during July 2016 was 624.80 MMSCM which is 6.05% lower than the monthly target and 10.96% less when compared with July, 2015. Cumulative natural gas production during April-July, 2016 was 2466.33 MMSCM which is 7.28% lower than the cumulative target and 12.59% lower than the production during the corresponding period of last year. Reasons for shortfall in production are as under:
- Underperformance of KG-OSN-2001/3, RJ-ON/6
- Underperformance of Raniganj East, Sohagpur West & Raniganj South CBM blocks
- Closure of one well in KG-DWN-98/3
- Natural decline in PY-1
- Water loading and sand ingress in Kharsang wells.
Refinery Production (in terms of Crude oil processed)
3 Refinery production during July, 2016 was 21220.94 TMT which is 9.19% higher than the target for the month and 13.67% higher than the production during corresponding period of last year. Cumulative production during April-July, 2016 was 81494.12 TMT which is 3.60% higher than the target for the period and 8.74% higher than the production during corresponding period of last year. Unit-wise production is given at Annexure-III.
Table 3: Refinery Production (TMT)
Oil Company |
Target |
July (Month) |
April-July (Cumulative) |
||||||
2016-17 (Apr-Mar) |
2016-17 |
2015-16 |
% over last year |
2016-17 |
2015-16 |
% over last year |
|||
Target |
Prod. |
Prod. |
Target |
Prod. |
Prod. |
||||
A. Public Sector |
134065.14 |
11115.83 |
11811.69 |
10053.77 |
824.81 |
44731.78 |
45614.25 |
40642.18 |
828.40 |
IOCL |
64299.99 |
5371.42 |
5685.86 |
4749.11 |
119.72 |
21224.38 |
21783.51 |
18317.17 |
118.92 |
BPCL |
24999.95 |
2062.27 |
2133.17 |
2027.54 |
105.21 |
8161.51 |
8335.57 |
8109.11 |
102.79 |
HPCL |
16500.42 |
1395.71 |
1420.68 |
1156.09 |
122.89 |
5778.58 |
5899.72 |
4913.91 |
120.06 |
CPCL |
10250.20 |
951.11 |
996.21 |
756.43 |
131.70 |
3648.25 |
3638.85 |
3599.80 |
101.08 |
NRL |
2669.99 |
231.37 |
236.90 |
252.56 |
93.80 |
911.07 |
924.58 |
665.63 |
138.90 |
MRPL |
15300.00 |
1100.00 |
1331.96 |
1106.76 |
120.35 |
4995.00 |
5004.13 |
5017.57 |
99.73 |
ONGC |
44.59 |
3.95 |
6.93 |
5.28 |
131.14 |
12.99 |
27.89 |
18.99 |
146.90 |
B. Joint Venture |
15000.00 |
1321.02 |
1410.45 |
1553.20 |
90.81 |
5232.71 |
5836.50 |
5444.97 |
107.19 |
BORL |
6000.00 |
525.00 |
501.85 |
631.08 |
79.52 |
2100.00 |
2184.22 |
1804.81 |
121.02 |
HMEL |
9000.00 |
796.02 |
908.60 |
922.12 |
98.53 |
3132.71 |
3652.28 |
3640.16 |
100.33 |
C. Private Sector |
89852.65 |
6997.19 |
7998.79 |
7061.52 |
113.27 |
28695.58 |
30043.37 |
28858.76 |
104.10 |
RIL |
69561.01 |
5306.19 |
6238.53 |
5306.19 |
117.57 |
21931.61 |
23065.59 |
21931.61 |
105.17 |
EOL |
20291.64 |
1691.00 |
1760.26 |
1755.33 |
100.28 |
6763.97 |
6977.78 |
6927.16 |
100.73 |
TOTAL (A+B+C) |
238917.79 |
19434.03 |
21220.94 |
18668.48 |
113.67 |
78660.07 |
81494.12 |
74945.91 |
108.74 |
*: Provisional
3.1 PSU Refineries’ production during July, 2016 was 11811.69 TMT which is 6.26% higher than the target for the month and 17.49% higher than the production achieved in the corresponding month of last year. Cumulative production during April-July, 2016 was 45614.25 TMT which is 1.97% higher than the target for the period and 12.23% higher than the production during corresponding period of last year. Reasons for shortfall of refinery production in some PSU refineries are as under:
- IOCL, Guwahati & Digboi: Lower crude availability.
- CPCL, CBR: Crude throughput lower than target due to planned shutdown.
- NRL, Numaligarh: Lower availability of Assam crude.
3.2 Production in JV refineries during July, 2016 was 1410.45 TMT which is 6.77% higher than the target for the month but 9.19% lower than the production achieved in the corresponding month of last year. Cumulative production during April-July, 2016 was 5836.50 TMT which is 11.54% higher than the target for the period and 7.19% higher than the production during corresponding period of last year.
3.3 Production in private refineries during July, 2016 was 7998.79 TMT which is 14.31% higher than the target for the month and 13.27% higher than the production achieved in the corresponding month of last year. Cumulative production during April-July, 2016 was 30043.37 TMT which is 4.70% higher than the target for the period and 4.10% higher than the production during corresponding period of last year.
3.4 Refinery-wise details of the capacity utilization and production of petroleum products during the month of July, 2016 and cumulatively for the period April-July, 2016 vis-?-vis April, -July, 2015 are given at Annexures-IV and V respectively.