27.03.2020, 15:17
Putin Approved Start of Design and Survey Work for Power of Siberia-2 Gas Pipeline
Source: OREANDA-NEWS
OREANDA-NEWS. Russian President Vladimir Putin agreed with the transition to the development of a feasibility study and the beginning of design and survey work for the Power of Siberia-2 gas pipeline. He said this on Friday at a meeting with the head of Gazprom, Alexei Miller.
“A preliminary feasibility study was carried out, which gave a positive answer that it is feasible, cost-effective”, the head of state informed the head of state. “Accordingly, please give instructions for the transition to the pre-investment stage - the development of a feasibility study and the start of the project exploration work for the Power of Siberia-2 gas pipeline. Miller noted that gas supplies will be oriented to the Western China market.
Gazprom estimates the volume of possible gas supplies through the Power of Siberia-2 to China through Mongolia at 50 billion cubic meters per year, Miller said. Prior to this, the volume of deliveries was announced at 30 billion cubic meters of gas per year.
“A preliminary feasibility study was carried out, which gave a positive answer that it is feasible, cost-effective”, the head of state informed the head of state. “Accordingly, please give instructions for the transition to the pre-investment stage - the development of a feasibility study and the start of the project exploration work for the Power of Siberia-2 gas pipeline. Miller noted that gas supplies will be oriented to the Western China market.
Gazprom estimates the volume of possible gas supplies through the Power of Siberia-2 to China through Mongolia at 50 billion cubic meters per year, Miller said. Prior to this, the volume of deliveries was announced at 30 billion cubic meters of gas per year.
Комментарии