IDGC of Centre in First Half of Year Managed to Get Compensation
During a large-scale raid operation conducted by staff of Distribution Zones and electricity metering offices of the company’s branches, including in conjunction with specialists from the security unit, in the service area of IDGC of Centre (11 subjects of the Central Federal District) revealed 6,234 facts of illegal consumption of electric energy. The total amount of identified non-metered and non-contractual consumption amounted to 90.5 million kWh, the amount of damage is about 248.6 million rubles.
Particular attention was given to work with trouble making consumers. Their check was preceded by thorough preparation and coaching participants of raids by specialists of the security units.
The power engineers took measures to compensate for the damage. Already in the first half of the year IDGC of Centre reimbursed 183.6 million rubles under 5,507 acts of non-contractual and non-metered consumption. In other cases the debt will be forced to be recovered, in the courts, with the laying of all court costs on perpetrators. Currently, the company’s specialists are doing claim-related work on all the facts of non-contractual power consumption.
Petitions on the facts of unauthorized electric energy consumption, revealed by the security unit of IDGC of Centre, were also sent to the police. According to review of statements criminal proceedings on grounds of crimes under Art. 165 of the Criminal Code of the Russian Federation (causing damage to property by deception or abuse of trust) were initiated.
Комментарии