Summary of Work of "Uzbekenergo" for 9M
OREANDA-NEWS. In JSC "Uzbekenergo" is taking the necessary measures for the sustainable functioning of the energy companies, the implementation of forecast parameters of production activity in 2016.
In order to achieve sustainable economic growth and stable operation of the electricity industry joint-stock company "Uzbekenergo" developed a set of measures to ensure the reduction of production costs and cost reduction of output, as well as proposed to be manufactured. Lowering the cost of production was for the 9 months of the current year - 101.4%.
During the 9 months of 2016 the enterprises of the company ensured the implementation of forecast parameters of production activity. Saleable production industry amounted to 100.2%. Implemented supply of electric energy in the amount of 35.0 bln KW h. Released thermal energy in the amount of 5.1 million. Gcal.
For the production of localized products Assignment based on local raw materials to factories for 9 months of this year performed at 146.1%.
Reduction of import due to the localization of production of imported products on the import and expansion of inter-sectoral industrial cooperation by JSC "Uzbekenergo" for 9 months of 2016 amounted to 102.2%.
As part of the decision of the President of the Republic of Uzbekistan dated 05.05.2015. Number PD-2343 "On the Program to reduce energy consumption measures, the introduction of energy saving technologies in the fields of economy and social sphere for 2015-2019" for 9 months of 2016 JSC "Uzbekenergo" guaranteed savings of 283.2 million. Cubic meters of natural gas, electricity 178.7 million. kW /h , 42,6 thous. Gcal. Thermal energy and oil 219.8 tons.
Assistance in service networks and carrying out design and survey, construction and installation works.
In accordance with the Decree of the President of the Republic of Uzbekistan dated 25.12.2015. Number PD-2458 "On investment program of Uzbekistan for 2016" are being implemented 23 large investment projects to create new, modernization and reconstruction of existing facilities. In the current year provided input of 5 objects.
To date is completed the 4 investment projects and filed under acts working commissions.
According to the project "Construction of external power supply for traction substations of" Angren-Pap "electrified railway line under construction carried out the construction of 110 kV overhead lines of 220 kV and a total length of 23.7 km.
According to the project "Construction of external power supply of traction substations of electrified railway line under construction" Samarkand - Bukhara "has completed the construction of 110 kV overhead lines with a total length of 20.2 km.
Within the framework of the project "Organization of production of overhead line fittings and insulators in the SIZ" Angren "(JV« Armaturno-izolyatorniy zavod ») has completed the first stage, the beginning of output is planned in the current year.