OREANDA-NEWS. IDGC of Centre and PJSC "EC "Sevastopolenergo" signed an agreement on mutual cooperation in prevention and elimination of consequences of failures at electric power facilities of the city of Sevastopol. This agreement was signed on the initiative of PJSC "Rosseti" in order to assist in the normalization of the situation with electricity supply in Sevastopol.

Under the agreement the parties should ensure organization of interaction in the following areas: operation through "emergency" mode in the city of Sevastopol; operation through the autumn-winter 2015/2016 period on the territory of the city of Sevastopol; formation of the program of modernization of electric grids of PJSC "EC "Sevastopolenergo".

In the city of Sevastopol ensure the agreement implementation is provided by 10 crews of IDGC of Centre, who are already familiar with the circuit of the electrical grid and passed the necessary instructions to perform work at electric grid facilities of PJSC "EC "Sevastopolenergo".

On the territory of PJSC "EC "Sevastopolenergo" IDGC of Centre placed for safekeeping crew vehicles of the company, staffed with necessary tools and devices, means of protection. An additional emergency reserve was brought in.

The organized interaction and made preparations will allow to reduce the time allotted for the arrival of repair crews of IDGC of Centre to the city of Sevastopol and the beginning of first responding and restoration work to 1 day.