EOG Develop Its Positions in Leonard and Second Bone Spring Sand
OREANDA-NEWS. In the Delaware Basin, EOG continued to actively test and develop its positions in the Leonard, the Second Bone Spring Sand and the upper Wolfcamp, as well as significantly reduce completed well costs and operating costs.
In the Leonard, EOG completed the Gem 36 State Com #1H in Lea County, N.M., which had initial production rates of 2,200 Bopd, 460 Bpd of NGLs and 2.6 MMcfd of natural gas.
In the Second Bone Spring Sand, EOG completed several wells with excellent results. In Lea County, N.M., EOG completed the Dragon 36 State #501H and #502H in a two-well pattern, which had average initial production rates per well of 1,415 Bopd, 115 Bpd of NGLs and 0.9 MMcfd of natural gas. Also in Lea County, N.M., EOG completed the Frazier 34 State Com #501H with an initial flow rate of 1,705 Bopd, 145 Bpd of NGLs and 1.1 MMcfd of natural gas.
In the Wolfcamp in Lea County, N.M., EOG completed the Hearns 27 State Com #703H, which had an initial production rate of 2,830 Bopd, 170 Bpd of NGLs and 1.1 MMcfd of natural gas.
Комментарии