Gazprom and OMV address cooperation within Nord Stream II
The parties addressed further actions within the Nord Stream II project, particularly setting up of a joint venture to be responsible for the gas pipeline design, construction and operation. In addition, the meeting touched upon the acquisition of a stake in the joint venture by OMV.
Background
OMV is a major partner of Gazprom in Austria.
On June 18, 2015 Gazprom, E.ON, Shell and OMV signed the Memorandum of Intent stipulating the construction of two strings of the Nord Stream II gas pipeline with an aggregate annual capacity of 55 billion cubic meters, to be laid from the Russian coast to the German coast via the Baltic Sea.
Комментарии