Bilibino NPP: Plan for Heat Supply Made by 103.6% in April
OREANDA-NEWS. In April 2015 Bilibino NPP has generated 16.2 million KWh of electricity, consumers were supplied 12.5 million KWh, heat output from the collectors was 17.0 thousand Gcal with the planned value 16.4 Gcal.
Schedule overhaul of the power unit 4 was completed ahead on April 27. Reducing the time of the repair works became possible because of good planning and optimization of the overhaul.
There are no violations of limits and safe operation conditions.
There are power units 1, 3, 4 in work at the nuclear power plant at the moment. The power unit 2 is in a planned overhaul. Dispatch task is being done.
The radiation background corresponds to the normal operation of power units and does not exceed natural background values at the plant and adjacent territory.
Комментарии