Head of the Central Directorate of RTN visited the Tver branch of IDGC of Centre
Pavel Budagov also visited the Grid Control Centre (GCC) of Tverenergo, established in order to optimize the operational and technological control over the power grid of Tverenergo, ensure the smooth operation of networks with the voltage up to 110 kV, and improve control over the state of electrical equipment in real time.
Mikhail Pilavov told the audience about the prospects of supervisory control in the company, as well as the benefits of modern equipment, which the Centre is equipped with.
Representatives of the RTN and Tverenergo discussed prospects of implementing remote surveillance of the power grid facilities.
Particular attention was paid to ensuring the reliability of 110 kV transits in the Pskov, Novgorod, Yaroslavl, Moscow region, as well as features of railway transit when "Sapsan" trains pass.
In the course of training on the topic "The fall of a pole onto a 35 kV overhead power line" operational staff of the GCC and Distribution Zone of Tverenergo demonstrated Head of the Central Directorate of RTN their availability to work under special conditions of the autumn-winter operation period.
Комментарии