Selecting a single contractor to design and build the Kerch Strait bridge
OREANDA-NEWS. The directive was drafted by the Ministry of Transport in line with Presidential Instruction No Pr-866 of 18 April 2014.
According to the presidential instruction on implementing measures to build a bridge across the Kerch Strait (hereinafter referred to as the Project), the Project should be completed no later than December 2018.
The signed directive designates Stroigazmontazh as the only contractor responsible for designing and building the bridge across the Kerch Strait.
Stroigazmontazh is the main company of SGM Group, a leading Russian holding company involved in construction projects in the oil and gas, transport and maritime sectors of the national economy.
SGM Group brings together a number of leading construction companies with long business experience in Russia and abroad. It has the required production assets and human resources for implementing large-scale projects, no matter how complex. SGM Group ranks 38th in the Expert-400 ranking of leading Russian companies and 35th in the ENR (Engineering News-Record) Top 250 International Contractors ranking.
Комментарии