SK Mist: Kotelniki Station of Moscow Subway Line to Open in 2015
OREANDA-NEWS. Escalators and the elevators for disabled passengers are in the shakedown phase at the Kotelniki Station of Tagansko-Krasnopresnenskaya Moscow Subway Line.
The builders of the SK MOST Group of Companies are finishing the station trimming operations. The utility lines have been already installed, cabling has been completed, and the life support, signaling and video surveillance systems are being configured.
A heating system has been installed under the granite slabs; it is under testing now to guarantee that it will facilitate station cleaning and ensure safety of passengers.
The train traffic is to be opened during the first months of 2015, which will be a great gift to residents of the suburban towns of Kotelniki, Lyubertsy, Dzerzhinsky, and Lytkarino.
Комментарии