Road Sarateni-Soroca Handed Over to State Administration of Roads
OREANDA-NEWS. December 02, 2014. As it is reported in the “Millennium challenge" Corporation, this long stretch of road in 93 km is renovated within the framework of the Compact program. By signing the Protocol on the transfer of roads, Public roads administration assumes all liability for the content of the new tracks, and also takes responsibility for the integrity of road infrastructure.
Within 12 months on the road will be checking for defects with a view to their elimination at the expense of the company – Road Constructor. It can be reminded that the repair works on the track Sarateni-Soroca were conducted from 2012 to 2014, and the road was commissioned in October 2014. The volume of investments allocated by the Compact program for the rehabilitation of the route, amounted to USSD100 million.
For these funds were also renovated 7 bridges and built 7 new bridges, including multilevel and railway bridges. 22 miles of sidewalk, lighting by 20 km of road, 12 km of metal parapet, more than 2 thousand of road signs, and more than 9 thousand of shiny objects on the dangerous terrain were built as well. Additionally were repaired about 10 km of the local roads that provide access to schools, hospitals and so on.
According to the Compact experts, the rehabilitation of road will reduce the cost of car repairs, reduce travel time, increase the number of trips and will provide an opportunity to start a new business, which consequently will lead to the creation of the new jobs.
Комментарии