KazTransOil Put 3 Facilities in Karaganda Region into Commissioning
OREANDA-NEWS. On the eve of the Day of the First President of the Republic of Kazakhstan “KazTransOil” JSC announced about completion of construction and reconstruction of three major production facilities: construction of “Kumkol-Karakoin” pipeline, the pipeline booster pump station at HOPS named after. B. Dzhumagaliyev and reconstruction of the power supply system at OPS Barsengir. These facilities are important components of the Kazakhstan-China project aimed at increasing the export of Kazakh oil to consumers in China and ensuring the expected growth of hydrocarbons consumption in the domestic market. At the moment, all of the facilities are put into operation.
Capital construction of the third line of “Kumkol-Karakoin” pipeline with the total length of 198.9 km at section 0 km - HOPS named after B. Dzhumagaliyev passing through the territory of Karaganda region is stipulated by the further implementation of the project on Kazakhstan-China pipeline extension. In particular, construction of an additional line of this pipeline is necessary to boost the export capacity and create technical capacity for supplying Kazakh oil to the domestic market, including the POCR, within the framework of ensuring energy security of Kazakhstan. The pipeline was constructed stepwise, by two sections. The first stage of the project on construction of “Kumkol-Karakoin oil pipeline (0-26 km) bypass line” was launched in August 2012. The certificate of the State Acceptance Commission on acceptance of the facility into operation was signed on May 30, 2013. In September 2013, construction of the second section (26 km - HOPS named after B. Dzhumagaliyev) began. The certificate of the State Acceptance Commission on commissioning of the second section of the pipeline was signed on September 30, 2014. The contractor in construction of this facility is “Electro-HSBM” LLP. The total construction cost amounted to 23 billion tenge.
Construction of the pipeline booster pump station using modern horizontal pump units at HOPS named after B. Dzhumagaliyev started in July of 2013. The former vertical booster pumps have become physically and morally obsolete for more than 20 years of operation and no longer meet the reliability and energy efficiency requirements. The new booster pump station is equipped with modern horizontal pumps providing oil pumping to the Shymkent refinery, HOPS Atasu and further towards China. These units have improved hydraulic characteristics and more robust designs that will increase reliability, reduce energy consumption and repair and maintenance costs. The certificate of the State Acceptance Commission on commissioning of the facility was signed on September 30, 2014. The total cost amounted to 1.1 billion tenge.
Reconstruction of the power supply system at OPS Barsengir located on “Pavlodar-Shymkent” pipeline in Zhezkazgan region was launched in October 2013. It was carried out in connection with the planned increase in volumes of oil pumping through “Kumkol-Karakoin-Atasu-Alashankou” pipeline. As a result of works held the physically worn out electrical equipment of the pumping station was replaced by new one, which meets all modern requirements for energy efficiency and saving at production facilities. The total cost amounted to 725 million tenge. The certificate of the State Acceptance Commission on commissioning of the facility was signed on October 31, 2014.
Комментарии