Employees of Spetsmost Win Awards for Services
OREANDA-NEWS. Medals were awarded to the company General Director Eduard Frizen, Chief Engineer Igor Efimov and Head of the Construction Project Sergey Afanasiev. V.V. Chernikov, Production Controller, and O.V. Golubovich, Driver, received Diplomas from Kaliningrad Governor.
Overpass was built as part of the reconstruction of the road section: Gaidar Street - Chelnokova Street - Soglasiya Street - Sovetsky Prospekt and Kaliningrad Northern Bypass. Overpass design: 15+24+15 m.
When the bridge was designed, it was decided to use prefabricated reinforced concrete beams. With this arrangement, conducting the most time-consuming operations at the factory reduced the scope and time on the construction site.
The builders of Spetsmost LLC have completed the construction six months ahead of schedule, thus allowing the entire 8-kilometer long city road to be commissioned earlier.
Комментарии