A Number of Important Audits Took Place in BMZ in June
OREANDA-NEWS. July 22, 2014. The representatives of certification body “Certification center of building goods” (Lithuania) carried out the certification audit of hot rolled reinforcing steel, grade У500 class У500-5 as for the correspondence to the Lithuanian standard LST EN 10080:2005.
The representatives of certification body "MPA BAU" (Germany) carried out the inspection audit of cold deformed reinforcing wire, grade B500A according to the requirements of the German standard DIN 488-1:2009, DIN 488-3:2009, DIN 488-6:2010.
The representatives of certification body "МРАNRW Dortmund" (Germany) carried out the inspection audit as for confirmation of certificate of conformity concerning the production of periodic profile rebars, according to the requirements of German standard DIN 488.
The representatives of certification body "WIEN-ZERT" (Austria) carried out the inspection audit of cold deformed wire, class В550Аin accordance with the standard ONORM B 4707:2010.
There was not revealed any non conformity basing on audits results.
Комментарии