CCCC Wins Highway Engineering of Section of State Highway 310
OREANDA-NEWS. July 11, 2014. CCCC Fourth Highway Engineering Co., Ltd. won the bid for Lot 4 of the subgrade works of highway engineering of the Dalijiashan (provincial boundary)-Xunhua section of State Highway 310, with a contract value of 460 million yuan and a construction period of 837 days.
Located in Qinghai Province, with a full length of 52 kilometer, the project is connected to the planned Xunhua-Longwuxia section of State Highway 310 and is an integral part of Qinghai's newly planned "3410 highway network". With a full length of 10.7 kilometers, in two-way four-lane highway design, the lot won by the company involves subgrade, bridge, interchange and culvert works.
After its completion, the project will become a new great channel linking Gansu to Qinghai and be of positive significance to promoting local economic development and the implementation of the strategy of west development.
Комментарии