CCCC Wins Survey & Design Project of Section of Beijing-Lhasa Highway
OREANDA-NEWS. July 11, 2014. CCCC First Highway Consultants Co., Ltd. and CCCC Highway Consultants Co., Ltd. won the bids for Lot N4 and Lot N3 of the survey and design project of the Shizuishan (boundary of Inner Mongolia and Ningxia)-Zhongning section of Beijing-Lhasa Highway.
With a full length of 285 kilometers, the section stretches from Shizuishan to Tongxin County on Beijing-Lhasa Highway; with a full length of 65.849 kilometers, a contract value of 51.98 million yuan and a survey & design period of 9 months, Lot N4 involves bridges measuring 5,080 meters and six interchanges (including one reserved); Lot 3 has a full length of 56.727 kilometers, a contract value of 73.58 million yuan and a survey & design period of 9 months.
As an integral part of Beijing-Lhasa State Highway as well as the most important and fastest south-north transport channel in Ningxia Hui Autonomous Region, the project links large and medium-sized cities such as Shizuishan, Yinchuan and Wuzhong from north to south.
Комментарии