CCCC Wins Offshore Wind Power Project
OREANDA-NEWS. July 11, 2014. CCCC Third Harbor Engineering Co., Ltd. has recently won the bid for the trial piling works of the wind turbine foundation of the 50MW offshore wind power project in Pinghai Bay, Putian, Fujian Province, with a contract value of 290 million yuan and a construction period of 150 days.
The project is located in Putian, Fujian Province, and the total installed capacity of the wind farm is some 50MW. The project won by the company involves vertical and horizontal static load testing of two sets of steel pipe piles, vibration frequency and acceleration testing, and submission of a report.
The project is of great significance to effectively reducing Fujian's coal consumption, alleviating environmental pollution and improving the power source structure.
Комментарии