MSU-90 Assembles High Pressure Pipeline in Turbine Building of LNPP-2
OREANDA-NEWS. The weight of the large size structure amounts to 94 tons.
The pipeline is used to drain the condensate to the deaerator. In order for the system to withstand high pressure, the metal thickness is from 17 to 22 mm, and the pipe line diameter is from 273 to 820 mm. The Company's specialists are facing a hard challenge to assemble all the steel pipes segments.
The parts for another five similar systems will be delivered to the construction site shortly.
Holding Company TITAN-2 - is the largest group of companies in the North-West, erecting the most important nuclear power and energy facilities. The organizations carry out the full cycle of construction and assembly works: from development of design documentation to commissioning of the facility.
Holding Company TITAN-2 is one of the main contractors in construction of units No. 1 and No. 2 of Leningrad NPP-2. The Holding Company's organizations carry out 30 % of civil works and 80 % of assembly works at the construction site. The specialists of the Holding Company are working at the first and the second unit facilities of the Leningrad LNPP-2. The works are currently carried out in the reactor building, turbine building, electric power supply building, water supply building, district heating buildings and other structures of the units.
Комментарии