OREANDA-NEWS. The Taganrog Boiler-Making Works “Krasny Kotelshchik”, a member of the power plant concern OJSC Power Machines, will manufacture and supply two HRSGs intended for operation at the gas turbines SGT-300 with unit capacity of 8 MW, for gas-turbine power plant ООО Mayak-Energia (Penza) with capacity of 16 MW. The correspondent contract was signed in December 2013. According to its conditions the equipment will be put into operation in 2015. The HRSGs manufactured at the Taganrog Boiler-Making Works are intended for thermal power provision of expanding production of PJSC Mayak.