HRSG of Krasny Kotelshchik Will Work in Budennovsk
OREANDA-NEWS. The Taganrog Boiler-Making Works "Krasny Kotelshchik", a member of the power plant concern OJSC Power Machines, has entered into a contract with OJSC "Kazancompressormash" for the supply of HRSG and auxiliary equipment. This product is designed for the construction of booster compressor plant of dry stripped gas with drive from Gas Turbine Unit at LLC "Stavrolen" plant located in Budennovsk.
According to the contract provisions "Krasny Kotelshchik" is obliged to develop construction and design documents necessary for order fulfilment, manufacture the equipment, deliver it, provide services on supervision and perform training of the operating personnel.
HRSG, manufactured by "Krasny Kotelshchik" for LLC "Stavrolen", will allow utilizing highly potential exhaust gases of gas turbine – drive of booster compressor plant on dry stripped gas. The equipment has some design peculiarities. Namely, according to the customer’s requirements it is planned to use open lay-out of HRSG that will be equipped with bypass chimney allowing elimination of possible restrictions from new equipment side on compressor plant operation.
Комментарии