OMZ Starts Hydrotreatment Unit Shipment for Syzran Refinery
OREANDA-NEWS. Izhorskiye Zavody, part of OMZ Group, started shipment of the first stage hydrotreatment reactor 3-R2001 and the second stage hydrotreater 3-R2002 to JSC Syzran Refinery, part of Rosneft Oil Company.
Reactor equipment was manufactured in line with the contract signed with Izhorskiye Zavody in 2012.
Hydrotreatment reactors for Syzran Refinery represent 31 meters high vessels and 6 meters across diameter, each reactor weighs nearly 600 tons.
The developer and license grantor of the base project for Syzran Refinery was the French company Axens.
Комментарии