SK MOST Connected Two Lines of Moscow Subway
OREANDA-NEWS. The first phase of operations connecting the new tracks to the operating Tagansko-Krasnopresnenskaya subway line has been completed at the Vykhino - Lermontovsky Prospekt section under construction. The track in the left interstation tunnel has been connected.
Reconstruction of the existing tracks of Vykhino Station included replacement of the crossing exit and a switch for connecting the main track I of the section that is under construction; the cable lines as well as signals and automatic control and remote control train traffic support systems were installed.
The ramp areas are being finished; a crossing to the right interstation tunnel is under construction, and preparations are underway to connect the track of the right interstation tunnel.
Комментарии