SK Most Finishing Operations at Two Stations of Moscow Subway
OREANDA-NEWS. The final touches are being done to Zhulebino and Lermontovsky Prospekt stations of Tagansko-Krasnopresnenskaya subway line in Moscow. The two stations will be commissioned in September 2013.
The finishing operations inside the stations have been practically completed, and the subway station exits have been built. The automatic control and remote control systems are put in place and the escalators are tested in operation. The area around the new subway stations is being landscaped.
The builders are also conducting operations that will allow Tagansko-Krasnopresnenskaya subway line to be connected to Kozhukhovskaya line, which is on the drawing board now. Lermontovsky Prospekt Station and Kossino Station of Kozhukhovskaya line will be used as transfer stations. The exit chamber structures for connecting the tunnels of the two lines are being built for the future connection.
Комментарии