General Director of IDGC of Centre Had Working Visit to Tambov Region
OREANDA-NEWS. During the visit, General Director of IDGC of Centre Centre Oleg Isaev had a working meeting with heads of structural subdivisions of Tambovenergo, at which the current progress of implementation of the investment program of the branch in the short and long term was discussed. Great attention was paid to the issue of the start of the repair campaign this year. Oleg Isaev also visited the Training Centre of Tambovenergo, in which operating personnel is trained with the use of advanced teaching methods.
Special attention was paid to the major investment project of the branch to provide power to a residential complex under construction "Cozy". IDGC of Centre — Tambovenergo division already provides electricity for the quarter under construction within the boundaries of Agapkin, named after Major-General V. Glazkov, Ryleyev and Free streets.
Under the power supply of the district "Cozy" in 2013 it is planned to install 4 package transformer substations of 10/0.4 kV. The branch has also planned activities for the construction of cable lines of 6 kV with their length of about 7 km and the installation of two transformer substations with a total capacity of 7.5 MVA. The cost of the energy infrastructure construction in the neighborhood will be 100 million rubles.
Implementation of these measures will allow to provide electricity to already built and under construction buildings, as well as facilities of social value, including a children’s garden.
After the end of the working visit General Director of IDGC of Centre Oleg Isaev, Deputy Head of the Administration of the Tambov region Nikolay Konovalov and Deputy Head of the Administration of the Tambov region Nikolay Perepechin visited a construction site of Mordovia Sugar Factory, which is one of the largest investment projects in the Tambov region. In March 2013 between IDGC of Centre — Tambovenergo division and LLC "Tambov Sugar Company" a contract was concluded on the implementation of grid connection of the sugar factory.
In general, according to the arrangement with the Tambov region about 37% of the total long-term investment program of Tambovenergo is reserved for grid connection of various facilities of the agro-industrial complex.
Комментарии