Rospan International Starts Boosting Gas Capacities in Novy Urengoy
OREANDA-NEWS. May 13, 2013. Rospan International CJSC (subsidiary of Rosneft) initiated works to expand the complex gas processing facility (CGPF) in Novy Urengoy license area. The overall volume of project investments will amount to approximately 5 bn rubles.
The project implementation will provide for a nearly double increase in gas and gas condensate production capacity – from 4.3 mln cubic meters to 7.5 mln cubic meters per day. The enhanced facility is expected to reach the designed capacity in 2016.
Notes for Editors:
CGPF is a complex of technological equipment and auxiliary systems that collect and process gas and gas condensate for the main transport system.
Rospan International CJSC produces gas in East Urengoy and Novy Urengoy license areas of the Urengoy oil and gas condensate field. the field’s Achimov deposits are the deepest ones that are being developed in Yamal. The asset’s current reserves are estimated at 994 bcm of gas, 150 mln tonnes of gas condensate and 50 mln tonnes of oil.
Комментарии