AB Klaipedos Nafta Selected Supplier for Construction Works
OREANDA-NEWS. The winner of the international tender of AB Klaipedos Nafta “Procurement of Engineering and Construction Works of Port Infrastructure (Jetty) with Suprastructure (Equipment) of Liquefied Natural Gas Terminal” was selected akciju sabiedriba (herein after – AS) BMGS.
During the implementation of the tender of AB Klaipedos Nafta “Procurement of Engineering and Construction Works of Port Infrastructure (Jetty) with Suprastructure (Equipment) of Liquefied Natural Gas Terminal” 3 final tender offers were submitted by 18 February 2013. Upon evaluation of the final tender offers according to the lowest price criterion, AS BMGS, which undertook to carry out all works for the total amount of 27.19 EUR (93.88 mln. LTL) excluding VAT, was recognised to be the winner.
AB Klaipedos Nafta sent an invitation to company AS BMGS to conclude a public procurement contract which must be signed after the period of deferment of 15 days which is applicable to the conclusion of the public procurement contract.
The contract between AB Klaipedos Nafta and AS BMGS for procurement of engineering and construction works of port infrastructure (jetty) with suprastructure (equipment) of liquefied natural gas terminal will enter into full force only if the Board and the general meeting of shareholders of AB Klaipedos Nafta approve of the conclusion of the contract.
In accordance with the bilateral agreement between AB Klaipedos Nafta and Klaipeda State Seaport Authority on the improvement and creation of Port Infrastructure / Suprastructure, part of the costs of the contract shall be reimbursed by Klaipeda State Seaport Authority (all costs for the Klaipeda State Seaport Infrastructure and part of the common work costs). Klaipeda State Seaport Authority shall reimburse to AB Klaipedos Nafta the amount of 14.20 mln. EUR (49.02 mln. LTL) excluding VAT. AB Klaipedos Nafta shall bear the costs for the amount of 12.99 EUR (44.86 mln. LTL) excluding VAT.
Комментарии