BG Group Starts New Extended Well Test in Brazil
OREANDA-NEWS. February 26, 2013. BG Group announced the start of a new extended well test in the Sapinhoa North area of the BM-S-9 concession in the pre-salt Santos Basin marking the delivery of another milestone in the field development plan, reported the press-centre of BG Group.
The floating production, storage and offloading vessel (FPSO) Cidade de Sao Vicente was connected to the 3-BRSA-788-SPS well, in water depths of 2 140 metres.
The FPSO will operate in the area for up to six months, gathering technical information on reservoir behaviour and oil flow in the subsea lines, amongst other data. During this initial test phase the well is expected to produce at around 15 000 barrels of oil per day (bopd) – as authorised by Brazil’s National Agency for Petroleum, Natural Gas and Biofuels.
Commercial production from the Sapinhoa discovery began early last month when FPSO Cidade de Sao Paulo started up, on time and on budget, with a capacity to process 120 000 barrels of oil per day and 176 million standard cubic feet of gas per day. Another FPSO, the Cidade de Ilhabela, also known as FPSO 4, will produce from the Sapinhoa field and is on track to start production in the second half of 2014. This FPSO has a production capacity of 150 000 barrels of oil per day and 212 million standard cubic feet per day of natural gas.
BG Group has a 30% interest in block BM-S-9, with operator Petrobras holding 45% and Repsol Sinopec Brasil S.A. 25%.
Комментарии