IDGC of North-West Announces 2013 Draft Repairs Program
OREANDA-NEWS. January 18, 2013. 2012 repair fund assimilation, according to data available as of December 26, 2012, made 1.58 bln RUR or 101% of the planned target.
IDGC of the North-West, JSC 2013 draft repairs program provides for a repairs fund amounting to 1,649 mln RUR. The greater part of the sum is planned to be allocated for repairs of the distribution grid (679 mln RUR), 220-35 kV substations – 356 mln RUR, 220-35 kV overhead lines – 248 mln RUR, buildings and structures – 155 mln RUR. 37 mln RUR are to be spent on emergency reserve maintenance.
To the extent of work on 220-04 kV overhead lines, IDGC of the North-West, JSC 2013 draft repairs program stipulates repair of 10,026.61 km of power transmission lines and replacement of 56,922 insulators, 19,291 poles, 1,714.94 km of wires. The planned target for 220-04 kV overhead lines forest corridors clearing is 12,753.78 ha.
Works on 220-35 kV substations involve comprehensive repair of 64 substations, repair of 12 power transformers, replacement of 43 power transformer inputs. Additionally, the draft repairs program plan stipulates repair of 1,776 transformer substations (indoor transformer substations, package transformer substations, distribution substations).
2012 repair fund assimilation, according to data available as of December 26, 2012, made 1.58 bln RUR or 101% of the planned target. IDGC of the North-West carried out repair of 8,834 km of 220-04 kV overhead lines (against the planned target equal to 8,639 km). The forest corridor clearing performance made 108% of the planned target: 14,552 ha cleared, the target having been 13,499 ha. One carried out comprehensive repair of 85 substations (100% of the planned target) and repair of 1,997 transformer substations (111% of the planned target).
Комментарии