OREANDA-NEWS. October 26, 2012. The consortium of CCCC Investment Co., Ltd., CCCC Second Highway Engineering Co., Ltd. and CCCC Highway Consultants Co., Ltd. won the bid for the BOT+EPC project of Guiyang-Weng’an Highway in Guizhou Province, with a contract value of 10.8 billion yuan, reported the press-centre of CCCC.    

With a full length of 97.65 kilometers, a subgrade width of 24.5 meters, a designed speed of 80km/h, a bridge-tunnel ratio of 41.52 percent, a construction period of 3.5 years and a tolling period of 30 years, in two-way four-lane design, the project stretches from Peixi interchange on the northeastern ring road of Guiyang Beltway to Jiangkou-Weng’an Highway in planning.

The successful bid is of great importance for the company to step up business restructuring, further develop new investment fields and push forward the economic and social development of areas along the highway.