SGM Started Construction of 2nd Sting of Urengoy - Surgut Pipeline
OREANDA-NEWS . September 4, 2012. As a result of a public request for proposals, JSC “Gazprom” announced LLC “STROYGAZMONTAZH” the winner of the tender for construction of the 2nd string of Urengoy – Surgut main condensate pipeline.
Employer is CJSC "Yamalgazinvest".
The scope of work includes construction of 80 km long and 720 mm in diameter linear part of the condensate pipeline at the section 508 km — 588 km of the route located in the Surgut region of the Khanty-Mansiysk Autonomous District, as well as the sites for pig receivers and two shunt pipes.
Urengoy — Surgut main condensate pipeline ensures supply of liquid hydrocarbons from the Urengoy plant for condensate preparation to the Surgut condensate stabilization plant.
Currently, equipment is being relocated to the place of construction works in Kogalym and the sites for residential construction camps and bases for temporary storage of materials and pipes are being prepared.
Комментарии