CPC Invests in Astrakhan Oblast Human Capital Assets
OREANDA-NEWS. July 31, 2012. Nikolay Platonov, General Director of Caspian Pipeline Consortium, made a working trip to Astrakhan Oblast where he informed Governor Alexander Zhilkin of the Expansion Project work status on the territory under the latter's jurisdiction.
Together with A. Zhilkin the Consortium's Head participated in the ceremony for handing over medical equipment purchased by Caspian Pipeline Consortium-R under the program to support the region social sphere to the
In addition to the equipment handed over by CPC in 2011, the Health Center received twelve sets of medical apparatus and equipment for more than RUR 22M. The advanced equipment will allow to conduct comprehensive check of the cardiovascular system functioning, identify pathology of the blood circulatory system organs, also in handicapped people. Thus, thanks to the sector transducer for 4D research donated by the Consortium the Cardiology Center specialists have received an ability of conducting a 3D heart reconstruction on line for clarification of localization and the extent of cardiac valve damage in patients in need of cardiovalvulotomy. This apparatus has no analogues in the South Federal Okrug.
The Administration and
A partnership agreement between CPC-R and
The CPC pipeline system is one of the largest investment projects with foreign capital in the CIS. The length of the pipeline connecting oil fields in Western Kazakhstan with the Marine Terminal in
The CPC Project was originally developed with a view to a potential expansion of its capacity by 2 ? times up to 67 MTA (76 MTA with DRA). CPC Marine Terminal is equipped with single point moorings which allow to safely load tankers at a significant distance from the shore, also under unfavorable weather conditions.
The Expansion Project includes rehabilitation of the existing and construction of 10 additional pump stations (
Комментарии