Vice President of Council of Ministers of Cuba Visited "Zarubezhneft"
OREANDA-NEWS. July 30, 2012. Vice President of the Council of Ministers of the
Extraordinary and Plenipotentiary Ambassador of the
In the course of the talks the parties discussed in details realization of joint projects of JSC "Zarubezhneft" and the national petroleum company Cubapetroleo. Special attention was paid to the upcoming start of drilling of the first exploratory well at the Block L offshore
In November, 2012 JSC "Zarubezhneft" plans to begin drilling the exploratory well at Block L. On 29th of June the representatives of JSC "Zarubezhneft" signed a contract with Songa Offshore for the use of the "Songa Mercur" MODU for carrying out the drilling works. Independent international organization checked the production equipment of the drilling rig and according to the report "Songa Mercur" MODU complies with all necessary requirements, and availability of the equipment manufactured in the
During the past three years after signing of the contracts, "Zarubezhneft" carried out 2D and 3D seismic survey, engineering and geological research, environmental assessments, etc. Currently the supply of the necessary equipment and materials for the drilling of the well is being conducted.
Mr. Cabrisas said he was satisfied with the work progress and emphasized the need to follow all terms and schedules because these oil projects are very important for the economy of the
Комментарии