Murmansk Port Handles First Capesize Bulker
OREANDA-NEWS. July 25, 2012. Murmansk Commercial Sea Port for the first time handled Capesize dry bulk carrier at Berth Number 13. The TW Hamburg was loaded with 91,099 tons of export coal produced by SUEK, the stevedore company said. The berth depth is 12.5m while the bulker’s maximum draft is 14,9m.
The loading operation took four full days and 8.5 hours. The TW Hamburg has a length of 229 m, breadth - 38 m, and loaded draft - about 15 m.
Комментарии