CNNC Took Part in Meeting Regarding TNPP-2 Project
OREANDA-NEWS. July 19,
During the high level meeting, the life cycle management technology of JSC NIAEP compound engineering facilities was demonstrated to CNNC and JNPC management. According to Valery Limarenko, this technology, developed by JSC NIAEP, allows to visualize in details and effectively to operate the process of NPP construction, and that has been successfully proved-out during construction of power units 3&4 of Rostov NPP, and also to carry out operation of the plant at all stages of its life cycle. During the demonstration, the probability of use of the given technology was pointed out for construction of the NPS units in
The Russian side reported on the state of release of the working documentation for TNPS units 3&4. The sides stated that the documentation is released according to the schedule. As to the equipment of "first concrete” for the foundation of power units of TNPS second phase, its delivery will be started soon from
On Friday, July 6th, the Chinese delegation will go to Leningrad region where it will visit the “Izhora Works”, the industrial shops where the equipment for TNPS is being manufactured, and it will visit JSC "SPbAEP” as well.
Комментарии