Krasny Kotelshchik Shipped Equipment for Starobeshevskaya TPP
OREANDA-NEWS. June 14, 2012. Krasny Kotelshchik (the main manufacturing facilities of PJSC EMAlliance, a member of the power plant concern Power Machines) has manufactured and shipped twelve burners for Starobeshevskaya TPP. Total weight of equipment is 70.8 ton.
In November 2011 PJSC EMAlliance and PJSC Donbassenergo enterted into a contract for equipment supply for Starobeshevskaya TPP. According to the document, EMAlliance obligated to implement the Project and to supply equipment for modernization of the Boiler TP-100 of the Unit No.12 which will allow to substitute the present furnace chamber by the gas-tight one.
Usage of manufacturing process of burner inner parts with wear-resistant material overlaying welding is a peculiarity of the Project. For the first time this technology was applied in 2010 while manufacturing equipment for modernization of the Boiler TP--100 of the Unit No.11 of this plant.
Products manufactured with the usage of up-to-date technology will allow to rise engineering-and-economical performance of the Power Unit and to extend the range of anthracite steady combustion without usage of “lighting” of expensive liquid fuel or natural gas. Commissioning of the new Power Unit is aimed to rising of plant functioning reliability in whole.
Six steam turbines, each having capacity of 200 MW, manufactured by OJSC Power Machines are operating as constituent parts of the Power Units of Starobeshevskaya TPP.
Комментарии