OREANDA-NEWS. May 4, 2012. PJSC EMAlliance (a part of power-plant engineering concern OJSC Power Machines) has negotiated a contract for equipment supply for technical refurbishment of PC Energy Unit № 2 at Tripolskaya TPP (PAO Centrenergo, Ukraine).

Within the frame of reconstruction of Tripolskaya TPP Boiler Unit 300 MW EMAlliance will design and supply equipment of unique design for changing of heating surfaces, steam crossover tubes, steam-to-steam heat exchangers (SSHEs). The Taganrog Boiler-Making Works Krasny Kotelshchik (the main manufacturing facilities of PJSC EMAlliance) will manufacture the equipment. Planned period of completion of works is October-November 2012.

This equipment will allow Boiler steam capacity increase up to 1000 t/hour and Boiler capacity up to 325 MW. It will also allow to increase start-stop characteristics and all in all Energy Unit and Station reability of work. At the moment design rated/installed capacity of Tripolskaya TPP is 1800 MW.

The Boiler Unit reconstruction aims the increase of efficiency, reliability, safety factors and the extension of equipment service life and decrease of hazardous substances emission up to European Standards level.