Mikhailovcement Will Complete Overhaul of Rotary Kiln Number 2
OREANDA-NEWS. April 05, 2012. Another stage of a major repair campaign has been completed at “Mikhailovcement”, JSC.
The planned overhaul of the rotary kiln number 2 has been conducted.
During the repair campaign 2 ready-assembled kiln tires with the shells on piers number 7, number 8, and the girth-gear andspur pinion of the kiln’s main drive have been replaced. Also the following works have been carried out: kiln lining has been replaced, and air-quenching cooler and chain section have been repaired.
All repairs, which were carried out by the plant, were planned and included in a comprehensive program aimed at modernizing equipment and stabilizing plant’s production.
“EUROCEMENT group” Holding is an international, vertically integrated industrial holding, the leader in terms of the production of building materials in
“EUROCEMENT group” Holding is included in the eight largest cement companies in the world, comprises 16 cement plants in Russia, Ukraine and Uzbekistan, as well as plants for the production of concrete, reinforced concrete, non–metallic minerals quarries and facilities providing industrial construction services. Production capacity of the plants included in the holding is 37.5 million tons of cement, 10 million cubic meters of concrete. Stocks of non–metallic materials for the extraction of carbonate rocks with total explored reserves amount to over 2.8 billion tons, mining granite reserves are about 1.8 billion tons.
Комментарии