Magnitogorsk Iron and Steel Works Released 4Q Trading Update
OREANDA-NEWS. January 31, 2012. MMK trading update for Q4 and FY 2011
MMK Group operating highlights
Production, thousand tonnes
|
FY 2011 |
FY 2010 |
% |
Q4 2011 |
Q3 2011 |
% |
MMK Group crude steel |
12,195 |
11,419 |
7% |
3,109 |
3,182 |
-2% |
MMK |
11,724 |
11 419 |
3% |
2,826 |
3,015 |
-6% |
MMK Metalurji |
471 |
- |
- |
283 |
167 |
69% |
MMK Group steel products |
11,158 |
10,409 |
7% |
2,859 |
2,951 |
-3% |
MMK |
10,646 |
10,245 |
4% |
2,623 |
2,789 |
-6% |
MMK-Metiz |
465 |
450 |
3% |
103 |
126 |
-18% |
MMK-Metalurji |
505 |
156 |
224% |
233 |
160 |
46% |
HVA products, MMK Group (volume) |
4,066 |
3,968 |
2% |
1,028 |
990 |
4% |
HVA products, MMK Group (% of total production) |
36% |
38% |
|
36% |
34% |
|
Belon coal concentrate |
3,216 |
2,960 |
9% |
882 |
849 |
4% |
Iron ore |
4,825 |
4,680 |
3% |
1,145 |
1,224 |
-6% |
MMK Group's total crude steel output in 2011 was 12,195 thousand tonnes (+7% y-o-y)
MMK Group's total finished steel products output in 2011 was 11,158 thousand tonnes (+7% y-o-y)
MMK's total crude steel output in 2011 was 11,724 thousand tonnes (+3% y-o-y). MMK produced 2,826 thousand tonnes of crude steel in Q4 2011.
MMK's total finished steel products output in 2011 was 10,646 thousand tonnes (+4% y-o-y). MMK produced 2,623 thousand tonnes of finished steel products in Q4 2011.
MMK-Metiz's total finished steel products output in 2011 was 465 thousand tonnes (+3% y-o-y). MMK-Metiz produced 103 thousand tonnes of finished steel products in Q4 2011.
MMK-Metalurji's total finished steel products output in 2011 was 505 thousand tonnes, a increase of 3.2x y-o- y. MMK-Metalurji produced 233 thousand tonnes of finished steel products in Q4 2011 (+46% q-o-q).
MMK Group's total output of high value-added (HVA) products increased 2% y-o-y in 2011 to 4,066 th tonnes.
Production of coking coal concentrate in 2011 was 3,216 thousand tonnes (+9% y-o-y). Production of coking coal concentrate in Q4 2011 was 882 thousand tonnes (+4% q-o-q).
Consumption of own iron ore was 4,825 thousand tonnes (+3% y-o-y).
Steel segment
Production, thousand tonnes | ||||||
Production |
FY 2011 |
FY 2010 |
% |
Q4 2011 |
Q3 2011 |
% |
Cast iron |
9,496 |
9,234 |
3% |
2,277 |
2,440 |
-7% |
Crude steel |
11,724 |
11,419 |
3% |
2,826 |
3,015 |
-6% |
Finished products, of which: |
10,646 |
10,245 |
4% |
2,623 |
2,789 |
-6% |
Slabs and billets |
157 |
209 |
-25% |
102 |
0 |
- |
Long products |
1,499 |
1,065 |
41% |
372 |
479 |
-22% |
Flat hot-rolled products |
5,708 |
5,524 |
3% |
1,343 |
1,546 |
-13% |
HVA products, of which: |
3,283 |
3,448 |
-5% |
807 |
764 |
6% |
Thick plate (mill 5000) |
899 |
943 |
-5% |
171 |
178 |
-4% |
Flat cold-rolled products |
1,027 |
1,116 |
-9% |
302 |
245 |
23% |
Downstream products, of which: |
1,357 |
1,388 |
-2% |
334 |
341 |
-2% |
Tin plate |
134 |
208 |
-36% |
29 |
28 |
1% |
Galvanised steel |
493 |
597 |
-17% |
129 |
113 |
14% |
Colour-coated steel |
255 |
203 |
25% |
59 |
80 |
-26% |
Band |
98 |
116 |
-16% |
27 |
21 |
30% |
Formed section |
259 |
187 |
38% |
56 |
61 |
-9% |
Pipes |
49 |
75 |
-35% |
10 |
13 |
-23% |
Structural steel MMK Profile Moscow |
69 |
- |
- |
24 |
24 |
2% |
Shipments by market |
|
|
|
|
|
|
Domestic* |
7,181 |
7,044 |
2% |
1,673 |
1,943 |
-14% |
Export |
3,465 |
3,201 |
8% |
950 |
846 |
12% |
Average prices, finished products (USD) | ||||||
|
FY 2011 |
FY 2010 |
% |
Q4 2011 |
Q3 2011 |
% |
Average price per ton: |
|
|
|
|
|
|
Slabs and billets |
524 |
452 |
16% |
483 |
- |
- |
Long products |
687 |
595 |
15% |
654 |
699 |
-6% |
Flat hot-rolled products |
653 |
535 |
22% |
610 |
655 |
-7% |
HVA products, of which: |
981 |
793 |
24% |
905 |
1,011 |
-11% |
Thick plate (mill 5000) |
1,061 |
869 |
22% |
888 |
1,021 |
-13% |
Flat cold-rolled products |
787 |
621 |
27% |
761 |
805 |
-5% |
Downstream products, of which: |
1,074 |
882 |
22% |
1,043 |
1,155 |
-10% |
Tin plate |
1,134 |
960 |
18% |
1,079 |
1,197 |
-10% |
Galvanised steel |
1,028 |
841 |
22% |
1,022 |
1,099 |
-7% |
Colour-coated steel |
1,273 |
1,190 |
7% |
1,229 |
1,357 |
-9% |
Band |
1,008 |
778 |
30% |
930 |
1,022 |
-9% |
Formed section |
970 |
735 |
32% |
934 |
1,005 |
-7% |
Pipes |
845 |
671 |
26% |
789 |
877 |
-10% |
Structural steel MMK Profile Moscow |
1,247 |
955 |
31% |
1,295 |
1,348 |
-4% |
Average price per ton, of which: |
757 |
627 |
21% |
702 |
760 |
-8% |
Domestic* |
836 |
686 |
22% |
783 |
829 |
-6% |
Export |
593 |
497 |
19% |
558 |
601 |
-7% |
*including CIS
Production of finished slab in 2011 declined by 25% y-o-y to 157 thousand tonnes.
Production of flat hot-rolled products in 2011 was 5,708 thousand tonnes, 3% higher y-o-y. Growth was due to generally higher export sales, most of which is attributable to hot-rolled products.
Total mill 5000 thick plate production in 2011 was 899 thousand tonnes, to some extent lower y-o-y. This was due to a reduction in orders from pipe companies for rolled products for large-diameter pipes. Average price for mill 5000 plate in 2011 grew by 22% y-o-y.
Output of galvanised steel in 2011 declined by 17% y-o-y. This was due to a 25% increase in production of more expensive colour-coated steel in the same period. In 2011 galvanised steel was also shipped as a rolled product to MMK Profile Moscow, which makes structural steel products.
Output of formed section increased by 38% in 2011 y-o-y to 259 thousand tonnes. This was due to significant growth in demand from railcar makers undertaking fleet renewal programmes.
The average price per ton of finished steel product from MMK in 2011 was USD
Production, thousand tonnes | ||||||
Production |
FY 2011 |
FY 2010 |
% |
Q4 2011 |
Q3 2011 |
% |
Finished products, of which: |
465 |
450 |
3% |
103 |
126 |
-18% |
MMK output |
458 |
442 |
4% |
100 |
124 |
-20% |
MMK-Metiz's total finished steel products output in 2011 was 465 thousand tonnes (+3% y-o-y)
Production of finished products in Q4 2011 was 103 thousand tonnes, 18% down q-o-q. This was due to a seasonal slowdown in business activity in major consumer sectors for MMK-Metiz's products (construction and metallurgy).
Production, thousand tonnes | ||||||
Production |
FY 2011 |
FY 2010 |
% |
Q4 2011 |
Q3 2011 |
% |
Crude steel |
470 |
- |
- |
283 |
167 |
69% |
MMK-Metalurji finished products output, of which: |
505 |
156 |
224% |
233 |
160 |
45% |
Flat hot-rolled products |
187 |
86 |
117% |
115 |
60 |
92% |
HVA products, of which: |
318 |
70 |
356% |
118 |
100 |
18% |
Galvanised steel |
195 |
32 |
511% |
77 |
57 |
36% |
Colour-coated steel |
123 |
38 |
225% |
40 |
43 |
-6% |
Output of finished products at MMK's Turkish operations in 2011 was 505 thousand tonnes, more than 3 times higher than FY10.
In 2011 equipment commissioning process took place. Ramping up the main production facility to full capacity (2.3 million tonnes of finished products per year) is planned for H1 12.
Production, thousand tonnes | ||||||
Production |
FY 2011 |
FY 2010 |
% |
Q4 2011 |
Q3 2011 |
% |
Coking coal |
5,225 |
4,644 |
13% |
1,474 |
1,235 |
19% |
Mined |
4,160 |
4,207 |
-1% |
1,168 |
1,004 |
16% |
Purchased |
1,065 |
437 |
144% |
306 |
231 |
32% |
Coking coal concentrate |
3,216 |
2,960 |
9% |
882 |
849 |
4% |
Minor y-o-y decline in production of mined coking coal (-1%) in 2011 was due to large-scale reconstruction of walls during Q1, Q2 and beginning of Q3 of 2011. However, the resultant decline in production volumes during this period was largely compensated by higher output in Q3 and Q4 of 2011.
Output of mined coking coal in Q4 2011 rose by 16% y-o-y to 1,168 thousand tonnes.
Production of coking coal concentrate in Q4 2011 was 882 thousand tonnes, up 4% q-o-q.
RON
Production, thousand tonnes | ||||||
Production |
FY 2011 |
FY 2010 |
% |
Q4 2011 |
Q3 2011 |
% |
Iron ore (used at MMK), of which: |
4,825 |
4,679 |
3% |
1,145 |
1,224 |
-6% |
Bakal |
832 |
1,421 |
-41% |
137 |
190 |
-28% |
|
1,976 |
1,491 |
33% |
580 |
560 |
4% |
Slag processing |
2,017 |
1,767 |
14% |
428 |
474 |
-10% |
* from end-Q211 shipments from the Sosnovsky deposit are included in shipments from the
Consumption of captive iron ore in 2011 increased by 3% y-o-y to 4,825 thousand tonnes.
MMK's consumption of iron ore from its Bakal subsidiary in 2011 totalled 832 thousand tonnes, 41% lower than in FY10. This was due to lower shipments of iron ore after transfer of the Sosnovsky deposit from the Bakal subsidiary. Shipments from this deposit were subsequently included in shipments from the
Consumption of iron ore from the
Slag processing volumes in 2011 increased by 14% y-o-y to 2,017 thousand tonnes. This was due to the upgrades to the Amcom-1 processing facility in late 2010 and the launch of the Amcom-2 and Amcom-3 facilities, leading to higher processing of tailings.
Update on MMK Group's key investment projects Mill 2000
MMK is building a new production facility to benefit from growing demand for high-strength steels, and to substitute imports of high-quality automotive plate. The facility will use cutting-edge technologies to produce high- quality cold-rolled and galvanised products for use in internal and external car parts as well as for white goods and the construction industry The facility is expected to have a capacity of 2 million tonnes of finished products per year, including 700 thousand tonnes of galvanised steel.
The first stage of Mill 2000, including a continuous pickling line coupled with a tandem mill, was commissioned on July 15, 2011.
The facility is currently in the process of ramping up to full production capacity. In 2011, the mill produced 370 thousand tonnes of cold-rolled product. The mill continues to supply carmakers.
The second stage of the complex, which will include a continuous hot-dip galvanizing unit, a continuous annealing unit and a coil inspection unit, is to be commissioned in July 2012.
The Mill 2000 complex was supplied by the German metallurgy machinery company SMS-DEMAG. MMK-Metalurji
In order to strengthen its footprint in Middle Eastern markets, MMK constructed the MMK Metalurji steel production complex in
The continuous hot-dip galvanizing unit at the MMK Metalurji Istanbul site was commissioned on July 15, 2011. This marks completion of construction of the MMK Metalurji metallurgy complex, which is located at two sites: in
The annual production capacity of MMK Metalurji is 2.3 mln tonnes of finished steel products: hot-rolled coils, galvanised coils and colour-coated coils.
The advanced production technology installed at MMK Metalurji makes the plant one of the most advanced in
It is expected that steel consumption in
MMK plans to publish its consolidated IFRS financial results for Q4 2011 and
Комментарии