Assembly of Stands Started in Sochi Olympic Skating Center
OREANDA-NEWS. December 20, 2011. Blue seats of several tints will be installed on the stands. They will form a picture of interweave waves. The faсade of the building has the same color.
Over 500 seats on the colored stands will be occupied by members of the Olympic family, 400 seats are for journalists. Commentators’ cabins will face the arena. They will be fully equipped for reporting including on-line services. Photographers and TV-operators will be placed on 20 areas around the ice field. Over 100 seats of the lower level will be occupied by athletes and physically challenged fans.
Sochi Olympic Skating Center is planned for commissioning in 2012. Developer of the project is SC “Olympstroy”.
Комментарии