Izhorskie Zavody Completes Installation of Hydrotreater DS-302
OREANDA-NEWS. December 16, 2011. Izhorskie Zavody, part of OMZ Group has fully complied with contractual obligations before TAIF-NK oil refinery (
Under the contract signed in November 2010, Izhorskie Zavody for the first time committed themselves not only in designing and manufacturing of petrochemical hydrotreater DS-302, but the organization of its delivery and installation of its design position at the customer's site.
Installation of the reactor was carried out by Izhorskie Zavody’s service center together with a specialized installation company. The work was performed in the grounds of № 4 shop at TAIF-NK’s refinery. The reactor weighing 212 tonnes, has a diameter of
“The first experience of Izhorskie Zavody in an integrated approach to meeting customer requirements for the supply of petrochemical equipment was a success, - said Deputy General Director for Sales and Logistics Ilya Kovalev. We are convinced that only such an approach will help us to confidently compete with the world's leading manufacturers”.
At present Izhorskie Zavody carries out construction of four petrochemical reactors for JSC Angarsk Petrochemical Complex on various stages. Under this contract, Izhorskie Zavody will not only establish the foundations for the equipment’s design position at the customer's site, but also carry out installation internals in of each of the facilities.
OMZ Group is one of the leading heavy industry companies specializing in engineering, production, sales and service support of equipment for nuclear, oil and gas, mining industries, as well as special steel production and industrial services. OMZ Group’s facilities are located in
Комментарии