SK MOST Connected Tunnel in Northern Osetia
OREANDA-NEWS. September 12, 2011. Specialists of the SK MOST Group of Companies have completed
The tunnel construction was started in December 2010. The tunneling was performed by the mining method (using tunneling and drilling/blasting) simultaneously from the northern and southern ends.
When the tunnel is in service, it will ensure traffic safety along a 300-meters section of the Trans-Caucasus motorway, which has six critical spots of a potential avalanche hazard. The Trans-Caucasus motorway is the only transport route that links
Комментарии