Highland Gold Released Trading Update for First Half of 2011
OREANDA-NEWS. August 25, 2011. Highland Gold Mining Limited ("Highland Gold" or the "Company") is pleased to announce its trading update for the half year ended 30 June 2011. Full financial results for this period will be released on or about 19 September 2011.
HIGHLIGHTS
Mnogovershinnoye ("MNV"), Novoshirokinskoye ("Novo") (48.3% shareholding) and Belaya Gora combined produced
The Company is un-hedged and realised an average gold sales price of USD 1,453/oz in 1H
MNV exploration programme continues to target potential resources adjacent to existing operations
New JORC compliant audit increases MNV reserves by 190%
Novo continues production ramp up resulting in a 33% increase in processed tonnes compared to 1H 2010
Belaya Gora select oxide ore processing via MNV continued during the first half of 2011 and pre-construction preparations for a stand-alone processing facility remained on track with the submission of design documentation to Federal authorities
1.38 million oz of C1+C2 reserves at Unkurtash approved by the State Committee on Reserves in
Exploration drill works and underground development at Unkurtash site provides support for potential continuity of mineralisation along strike and at depth
Exploration work at Lyubov being compiled for GKZ regulatory submission and commencement of JORC audit by year end 2011
Blagodatnoye and Belaya Gora Flanks exploration properties continue to provide promising intercepts
The Company remains on track to produce 210,000 -
OPERATIONS
Mnogovershinnoye (MNV) -
Overall production remained in line with Company targets. During the first half, process plant throughput accounted for 499,082 tonnes of ore with
Mined ore tonnes and waste stripping volumes were both on target and equated to a 10% improvement on 1H 2010 performance. New mining equipment introduced in 2010 has helped in maintaining production targets as well as controlling operating costs. Additional equipment now in transit is expected to arrive on site during the second half of the year and will make a positive impact on production by providing an opportunity to retire some less efficient units. The near mine exploration programme continued drilling and trenching adjacent to existing mine workings and is focused on converting resources to reserves as well as adding potential new resources to help offset production depletion.
A 190% increase in proven and probable reserves resulted from a new JORC compliant audit carried out from June 2010 to July 2011. The primary factor for the increase in reserves was the use of a higher gold price assumption than in the previous audit from 2005.
MNV 100% |
Units |
1H 2011 |
1H 2010 |
Mine development |
|
| |
Waste stripping |
m3 |
790,897 |
713,390 |
Underground development |
metres |
2,915 |
3,627 |
Mining |
|
| |
Total ore mined |
tonnes |
606,440 |
550,018 |
Average grade |
g/t |
4.6 |
5.1 |
|
|
| |
|
tonnes |
499,082 |
521,855 |
Average grade |
g/t |
5.2 |
5.2 |
Recovery rate |
% |
87.7 |
88.1 |
Gold produced |
oz |
71,926 |
75,771 |
Novoshirokinskoye (Novo) - Zabaikalsky region,
Novo mine continued its ramp-up of operations and remains in line with expectations. Production improvements are expected to continue in both ore mining and processing with approximately. 450,000 tonnes of ore expected to be produced by year end. During the first half, underground ore production, waste development metres and processed ore throughput all exceeded their respective targets. Access to additional stoping blocks continues as a main focus of underground development in order to provide flexibility in future ore supply to the process plant.
Novo 100% |
Units |
1H 2011 |
1H 2010 |
Mine development |
|
| |
Underground development |
metres |
3,614 |
3,143 |
Mining |
|
| |
|
tonnes |
218,978 |
121,748 |
Average grade * |
g/t |
6.6 |
6.1 |
Processing |
|
| |
|
tonnes |
217,953 |
163,323 |
Average grade * |
g/t |
6.6 |
5.4 |
Recovery rate * |
% |
84.9 |
78.0 |
Gold Produced * |
oz |
39,214 |
20,741 |
*calculated approximate Au equivalent
DEVELOPMENT PROJECTS
Belaya Gora -
|
Units |
1H 2011 |
4Q 2010 |
Mining |
|
| |
Waste stripping |
m3 |
202,310 |
226,000 |
Total ore mined |
tonnes |
225,190 |
76,000 |
Average grade |
g/t |
2.1 |
1.7 |
Select ore to MNV |
tonnes |
42,265 |
26,700 |
|
g/t |
2.6 |
2.4 |
|
|
| |
|
tonnes |
30,460 |
10,971 |
Average grade |
g/t |
2.6 |
3.3 |
Recovery rate |
% |
87.3 |
87.3 |
Gold produced |
oz |
2,191 |
1,000 |
The Belaya Gora project continued to build momentum. The stand-alone process plant designs were completed and submitted to government authorities in anticipation of receiving the permit for construction in 2H 2011. Open pit ore and waste mining operations were maintained in order to increase ore stock feed for the future plant. During the first half of 2011 30,458 tonnes of ore were processed at MNV and resulted in the production of
Taseevskoye - Zabaikalsky region,
A new drilling programme, deemed critical for future design, was initiated during 1H 2011 for ore characterisation. This programme will ensure that the planned semi-industrial pilot test works will be completed using fully representative samples from each of the varying ore zones located within the potential open pit. Once collected, these samples will be used in the final process flotation and autoclave recovery tests which are now expected in 2012. The Company believes this to be a prudent course of action to ensure that test lab results can be reproduced in an industrial production environment.
EXPLORATION
In 1H 2011 the Company substantially increased its exploration budget to more than USD 10 million out of a planned full year expenditure of USD 30 million.
Unkurtash -
The approval of an initial 42.9 tonnes (1.38 million oz) gold reserves (C1+C2 category) by the regulatory authorities of
Lyubov -
In 1H 2011 the Company completed a
Blagodatnoye -
At the Blagodatnoye prospect located
Belaya Gora Flanks -
During 1H 2011 the Company commenced its trenching and diamond drilling programme at several gold prospects historically known to be located within the license area. The 2H 2010 acquisition included the exploration and mining rights for the license area (a total of 33 sq km) which encapsulates the Belaya Gora deposit and represents excellent near-mine exploration potential. Total trenching of
Mnogovershinnoye -
At the Pebble and Quiet prospects the Company continues with its near-mine surface exploration programme, which in 2011 will allocate
Mr. Werner Klemens, Head of Exploration at Highland Gold has reviewed and verified the information contained in this release with respect to drilling and resource / reserves matters. Mr. Klemens holds a Ph.D. in Geology from the
HEALTH, SAFETY & ENVIRONMENT
During the first half of 2011 the Group's overall safety performance was negatively impacted by incidents involving ancillary vehicles, accounting for seven lost time injuries out of a total eleven recorded during the period. A review of all incidents noted that poor weather conditions and individual errors were the major contributors resulting in several corrective measures and controls being implemented. As a result, the lost time incident (LTI) rate (the LTI rate is the number of lost time incidents for every 200,000 man hours worked) increased to 0.84 up from 0.25 achieved during 1H 2010.
746 employees went through introductory (1 day) safety training, 235 employees completed courses in safe working methods, labour protection and industrial (3/5 days) safety training and 291 employees were involved in industrial safety certification by the RosTechNadzor Agency. In addition, special courses included 51 drivers and 13 managers receiving vehicle safety and driving training with a focus on vehicular incident mitigation.
Our approach to Health and Safety remains a focus for improvement and in keeping with this approach, licenses were obtained for site medical facilities at both MNV and Novo operations. These licenses are expected to help improve medical response times and health testing services for employees.
Environmental compliance remained in good standing with regulatory authorities. Environmental safety training was provided to 68 employees at MNV, Belaya Gora and Taseevskoye. The Company has progressed with its programme of Environmental Management Systems (EMS) through an independent consultant specialising in ISO 14001 standards. The programme is expected to continue through to the end of 2012 at which time certification is targeted.
NEW APPOINTMENTS
During the latter part of the first half of 2011, two new appointments to the management team took place.
Tatyana Breeva retired as Chief Financial Officer of the Company. We are grateful for her valuable input as CFO since 2008. Alla Baranovskaya has joined the Company as the new CFO. After graduating with honors from the Economic faculty of the
Ulan Kachkynbekov joined the Company as General Director of Highland Exploration LLC which oversees the Unkurtash operation. He graduated from the underground mining faculty of the Kyrgyz Mining and Metallurgical Institute as a specialist in mining engineering. Prior to joining the Company, he worked for Kumtor Gold, Frontier Mining Ltd., European Minerals, Global Gold and Kazakhmys Gold Kyrgyzstan.