Krasnoyarsk CHP-4 Performs Scheduled Repair Works
OREANDA-NEWS. August 11,
For purposes of taking the measures for Krasnoyarsk CHP-4 preparation for work during the autumn/winter season, complete outage of all the thermal and mechanical equipment will be arranged at Krasnoyarsk CHP-4 at 00:00, on the 8th of August. During the outage period a vast array of repair and preventive measures are to be taken. The plant personnel will be involved in inspection of pressure regulator RD-1 on the Sosnovoborsk town heating network straight pipeline, replacement of flow regulator GRV-5 on the DSV heating water pipeline as well as replacement of the drain pipeline. During the outage period one will undertake inspection of electrical equipment and PCS equipment.
According to technical specifications and safety rules the works listed above require boilers outage and heating network disconnection.
The works are performed by both contractor organizations (JSC “Sibenergoremont”, CJSC “Hydromontazh”) and proprietary personnel.
All the works, followed by hydraulic tests, are scheduled to be over by 24:00, August 11. On August 12 supply of hot water to Sosnovoborsk consumers will resume.
Комментарии