Ukrenergo Delegation Participated in ZTR Technical Seminar
OREANDA-NEWS. May 18, 2011. Delegation of SE “National Energy Company “Ukrenergo” led by Mr. Grigory Grimud, Chief Engineer, visited PJSC “Zaporozhtransformator” on April 20 – 21. The visit was purposed for participation in the technical seminar “Issues of operation of transformer equipment with worked-out service life”.
Within the visit, “Ukrenergo” delegation has became acquainted with the main production workshops of ZTR, the scope of services that includes not only complex diagnostics employing besides the most up-to-date equipment, the other services ensuring solution of entire spectrum of issues related to operation of the transformer equipment. The members of delegation have noticed the modern level of available technology, large-scale modernization and high production standard.
“We are nicely surprised at the quality and the scope of reforms at ZTR: enterprise is actively developed, modernized and improved, – noticed Mr. Grigory Grimud. – Our delegation has prepared a wide list of questions and all of them were competently answered. The representatives of our delegation noticed a high standard of professionalism of the plant staff at all levels. We are sure in further collaboration of our companies based on many years' experience of mutual activities, efficient partnership and good neighborly relations”.
Within several recent years, NEE “Ukrenergo” has been the key customer of the plant in the domestic market. Since 2004, “Zaporozhtransformator” has collaborated with all Electric-power systems of NEC “Ukrenergo”: North, South, West, South-West, Central, Donets Basin, Dnepr and
Комментарии