Leningrad Metallurgic Works Tested Equipment for Boguchanskaya HPP
OREANDA-NEWS. April 7,
Functional testing of hydro-mechanical governor and control panel has been carried out in accordance with the specification of SHC EHR factory acceptance testing. Testing results demonstrated a full compliance of the equipment with customer’s technical documentation and requirements.
The main functions of SHC EHR include the following:
· Control of active power and frequency of HPP units in both automatic and manual modes;
· Activation of unit protection systems and mechanisms in emergency;
· Control and monitoring of all types of electro-hydraulic drives.
Software and hardware complex is based on programmable logic controllers (PLC) that boast high reliability and durable MTBF (mean time between failures).
Комментарии