Tomskgazstroy Signs up for Tomskgazprom Construction
OREANDA-NEWS. January 14, 2011. JSC Tomskgazstroy, a subsidiary of HMS Group, has won JSC Tomskgazprom tender for oil gathering network construction at Kazansky oil and gas condensate field as well as Severo-Ostaninsky and Boltnoye oil fields.
The companies signed construction agreement in December 2010. The four-month project lasting from January to April 2011 includes construction and installation of a 41-kilometer multi-diameter pipeline with cleaning and diagnostic facilities in Parabelsky district of Tomsk Oblast.
The challenge here is the remoteness of construction site from roadways, populated areas and power facilities. JSC Tomskgazstroy has a lot of experience with such projects. The company is used to working in challenging geographies and climatic conditions and has all required capacities, highly qualified staff and expertise to ensure that all construction work is completed with high quality and on time.
JSC Tomskgazstroy was established in 1968 and has been a subsidiary of JSC HMS Group since 2007. The company builds and overhauls oil, gas, product and condensate pipelines as well as residential and urban development projects.
The company employs highly qualified staff and has all necessary construction machinery, equipment and tools. Its dedicated welding and insulation quality control lab uses state-of-the-art equipment.
JSC Tomskgazstroy clientele includes some of the leading oil and gas companies such as JSC Gazprom (LLC Gazprom Transgaz Tomsk; JSC Tomskgazprom), JSC NK Rosneft (RN Tomskneft), JSC Gazprom Neft (LLC Gazpromneft-Vostok), JSC ANK Bashneft, JSC AK Transneft, JSC Slavneft-Megionneftegaz, ONGC Videsh Limited (Imperial Energy - LLC Nord Imperial).
Комментарии