OREANDA-NEWS. January 12, 2011. Oil Rocks Offshore Drilling Works Office of SOCAR Complex Drilling Works Trust has started drilling of the first well from the platform #620 at Darvin Bankasi field by order of Absheronneft OGPD.

The project depth of the well #677 drilled to Girmaki Suite totals 1280 meters. The daily production of the well will make 5 tons of oil. It is to mention that 20 wells planned to be drilled totally from the platform #620. According to the geologists, the daily output of the wells with average depth of 1350 meters will make 5 tons of oil per well.