Savinsky Cement Plant Posts 3Q Operational Performance Results
OREANDA-NEWS. November 24, 2010. CJSC Savinsky Tsement Plant has posted the following production results the 9 month period: clinker production – 187 thousand tons, cement production – 267.6 thousand tons and dispatches – 283.9 thousand tons.
Considering that cement grinding has been in process since as late as March and the plant’s kilns were not launched into operation until May, over the spring-summer operating cycle the plant managed both to mirror the previous year’s output levels and to show a superior performance for a range of production targets. Thus, in particular, cement production and cement dispatches were respectively 23.2 thousand tons and 20.4 thousand tons up on the same period a year ago.
Over the recent few years the plant has certified 8 cement grades representing the entire cement product line. TSEM II/A-SH 32.5 N cement with its civil, housing and agricultural construction applications as prefab reinforced concrete, foundations, beams, slabs, wall panels and other products and thanks to its frost/water resistance retains its No. 1 position among construction firms. From year to date this grade has accounted for 72% of the plant’s total cement production.
This year the
Комментарии