Russian Developments for Greek Power Industry
OREANDA-NEWS. October 15, 2010. JSC “EMAlliance” and company "Integro LTD" (Greece republic) signed the Contract on TPP “Keratsiny” with the total capacity 200 MWt upgrading. The total cost of works on the project amounts to 260 thnd. Euro. Project performance time is 8 months.
In accordance with the Contract conditions it is expected to deliver the HP spiral type preheater designed by EMAlliance engineers for TPP “Keratsiny” power unit №8. In the course of bidding JSC “EMAlliance” specialists suggested the replacement of the existing HP Chamber type Preheaters by Russian spiral type HP preheaters. Having considered the proposals of the largest companies of Czech Republic, Germany, French and Italy the Customer found the proposals made by Russian companies more advantageous.
It should be noted that the equipment manufactured by EMAlliance has previously been successfully exported to Greece for TPP Keratsiny "(gas-and-oil fired boiler P-56), TPP " Florina" (PN-600), TPP "Card" (PN-550), TPP “Agios Dimitrios" (PN-550).
On commenting the signing of the present Contract the Senior Vice-President of “EMAllaince” has noted that the Contracts of similar nature confirm the readiness of “EMAllaince” to offer to its Customers more advanced and efficient equipment designed with consideration of power facilities specific operation and met the most rigid EN standards.
Комментарии